1.
Depending on the plaster thickness, various preparations must be made when installing the module:
25-30mm Putzauftrag: Plaster thickness of 25 to 30 mm:
Module requires plaster thickness of 25 to 30 mm for standard
installation.
-25mm Putzauftrag: Plaster thickness < 25 mm: If plaster
thickness is less than 25mm, an insert (230x150mm) has to be
put in place during concrete work already in order to make up for
lacking plaster thickness.
+30mm Putzauftrag: Plaster thickness > 30mm:
If plaster thickness exceeds 30mm, a false edge has to be
established under the module in order to make up for excessive
plaster thickness.
2. Mark desired position for luminaire on raw ceiling with a cross.
3. Align module with marking and use a 5mm drill to drill the holes
needed for fixing the module with concrete screws. If necessary, adjust to desired
plaster thickness using the adjusting screws.
4. Carefully fix module on raw ceiling using the concrete screws
enclosed in your delivery and make sure it is fastened securely. Attention: Cooling plate must not be deformed!
5. Establish module’s electrical connection. Make sure to observe
serial cabling (series connection) and maximum current feed.
Terminal clamp : cable cross section max. 1,5 mm².
6. Carry out continuity test to check if electric circuit is closed. Then remove wire link.
7. Insert the red protective cover.
8. Plaster ceiling as desired. Use large-scale plaster fabric when plastering over luminaire module.
9. Make sure that after plastering, entire circle of red protective cover is cleared and visible. Clean any plaster residues from protective cover.
10. Remove the protective cover and prime and paint module and
filler ring with ceiling paint. Make sure that no primer or paint gets into the fixture into the LED insert.
11. Put desired LED insert flush into LED mounting and turn clockwise by approx. 90° until it sits securely. You may use the DOT 28 System mounting pliers to do so. CAUTION: HOT PLUG! Every luminaire ist tested in live operation before shipping.