Einbau
TRIM RENDEL 28, TRIM FLAT 28 und
TRIM FLAT 68-28*

INSTALLATION DEPTH:
TRIM RENDEL 28: 50mm
TRIM FLAT 28: 60mm
TRIM FLAT 68-28: 60mm

LOAD CAPACITY:: max. 10kg
TOOLS: Ø 38mm drill oder * Ø 68mm

1. Drill a hole with 38mm in diameter (*Ø 68mm).

2. (OPTIONAL) If you use a mini led-driver for a luminaire, please connect it before mounting the cavity bracket. Observe an additional air space.

3. Insert the cavity bracket into the hole. Use a 1,5m allen key to turn thethe two fastening screws anticlockwise until the cavity bracket is secured. To ensure that the hexagon socket of the fastening screw is not overtightened, this must be done with a little strength.

4. Now mount your component of the DOT 28 System using the bayonet lock.

Observe general information regarding installation of DOT 28 luminaires and maximum current feed: At least 1dm³ of air space must be provided for the DOT 28 and 5dm³ for the DOT 28 Power. The minimum installation depth must be observed. The luminaire must not be insulated or covered with a vapor barrier, fleece or foil!