Installation SFERE 28


MAX. CURRENT:
Installation heights lower than 230cm: 250mA
Installation heights over 230cm: 350mA


For wall-installation, use SFERE 28 with additional bayonet mounting for wall installation (ArtNr. 278505).

1. Connect the luminaire correctly to the feed of the led-driver (constant feed, max. 350mA if installation height is over 230cm). The led-driver must be disconnected from the power supply!

2. Insert the luminaire into the bayonet mechanism of the ceiling outlet. Carefully rotate SFERE 28 by 90° to the right and pull down until the mounting sits flush with the ceiling.

For different orientation, rotate SFERE 28 by 180° before inserting it into the bayonet mechanism.

To de-install, lift SFERE 28 and rotate counter-clockwise by 90°.

For wall-installation, use SFERE 28 with additional bayonet mounting for wall installation (ArtNr. 278505).