Electrical Installation


1.Connect the luminaire to the feed of the converter.
2. Use fuse tongs (Art.Nr. 168101) to insert luminaire into bayonet mechanism. Carefully rotate DOT 28 by 90° to the right and pull down until it sits flush with the ceiling.

ATTENTION

Reserve enough space for cooling element. Adhere to minimum installation depth. Do not over-insulate or cover with steam brake, fleece or film!

Installation DOT 28 Balda

MAXIMUM LOAD 1 TO 10 KG, DEPENDING ON CABLE AND MODULE
1. Tighten BALDA bayonet mechanism to luminaire cable hand-tight. (OPTIONAL 1) Screw hole for rope suspension provided in bayonet mechanism, using a 1.5mm drill.
(OPTIONAL 2) Run luminaire wire through hole and adjust to desired length.
2. Push bayonet mechanism up with slotted screwdriver and rotate clockwise by 90°, then pull downwards until it locks into place.
To de-install, lift bayonet mechanism and rotate counter-clockwise by 90°.
For a rope suspension use BALDA S (Art.Nr167050).

Installation ORB 28

HANDLE LUMINAIRE CABLE WITH CARE. DO NOT BEND! DO NOT REMOVE PROTECTIVE TUBE BEFORE COMPLETING INSTALLATION!

1.Adjust and carefully secure cable length using the two socket screws. Install pendant luminaire according to the installation manual enclosed and mount luminaire into the ceiling with the bayonet mechanism (see left).
2.After setting the right length, use enclosed blade and carefully open side of protective tube.
3. Cut protective tube just below bayonet mechanism.
4. Carefully remove protective tube from cable.

Installation Verve


1. Make sure the recess of the luminaire remains clean and undamaged during the whole process.
2. Screw the luminaire module onto the same substructure as the plasterboard (12.5 mm). If there is double plating, make sure there is an adequate recess in the first plasterboard plating.
3. Put some fabric tape into the spatula border intended therefor. Finish the joints cleanly and neatly and use a filler which is elastic enough.
4. Ground and apply the paint on the luminaire. (Best use a small structured roll.)
The luminaire is not suitable for outside.

Don’t use the luminaire on coarse-grained plaster!

Installation
VERVE AIR

Sorry, currently this content is only available in German.

Vlobe installation

Electrical installation

1. Connect the device to the mains.
2. Lead the illuminant with the provided pens. 3. The installation guidelines of the illuminant manufacturer should always be observed during installation the illuminant.

All electrical installations have to be made by an authorized electrician you trust.

Installation VOLEM

Volem: With a hole cutter (diameter: 120mm), drill a hole into the plasterboard at the intended location. Screw the luminaire module onto the same substructure as the plasterboard. Finish the joints cleanly and neatly and use a filler which is elastic enough. Ground and apply the paint on the luminaire. The illuminant is not suitable for outside – IP 20!

Volem extro: Screw the construction board on the substructure of the plasterboard ceiling. Mount the plasterboard firmly on the substructure. Fix the plaster module on the construction board. Fill joints cleanly and neatly by using a fabric tape. Ground and apply the paint on the plaster module.

Electrical Installation All electrical installations have to be made by an authorized electrician. Lead the wires through the opening in the luminaire module and connect them to the base supplied. Bend the tension flaps back so you can insert the light fixture into the module. Push the base into the module until the tension flaps lock into place.