Installation Filler Inset 68-28

INSTALLATION DEPTH: 80mm BEARING LOAD: max. 5kg TOOLS: 68mm hole cutter, cordless drill

  1. Drill 68mm hole.
  2. Run cable through opening and insert spackling insert. Screw into ceiling from below.
  3. Adjust installation depth (1-10mm) by turning ring.
  4. Fasten supply line to protective cover and use it to close opening. Make sure plaster claws have a solid grip in the plaster.