FITTING.

SCREWING.

FILLING.

PAINTING.

DONE.

Installation DOT 28 plaster

  1. Screw the construction board onto the substructure of the plasterboard ceiling
  2. Mount the plasterboard firmly on the substructure. Fix the plaster module on the construction board.
  3. Fill joints cleanly and neatly by using a fabric tape. Ground and apply paint on the plaster module. Don´t use the plaster module on coarse-grained plaster!
  4. Install the corresponding DOT 28 system. For instructions, see reverse.

Installation DOT 28 timber

Mounting in timber with mounting ring

  1. Use a drill with a diameter of 35 mm (1.37 in) to drill through the wood.
  2. Take the mounting ring and fix it in the wood levelly with the grub screws. for thin wood panels of up to 20 mm (0.79 in), we recommend additionally gluing the wood mounting ring. OPTION: For quick and level mounting, use the mounting aid. (style nr 168070)

Mounting in timber - Solid wood ceiling with mounting box

  1. Use the CAD data provided on http://georgbechterlicht.at/holz-kapsel/55-de to mill the necessary recesses.
  2. Glue the mounting box into the milled recess.

Installation DOT 28 concrete

  1. Sufficiently grease the formwork plug. Nail the formwork plug onto the formwork.
  2. Using a screwdriver, break out the openings needed for the empty conduit and clean the opening.
  3. Press the empty conduit into the opening until it is firmly fixed in place (2-3 ridges).
  4. Press the mounting box onto the formwork plug until it locks into place firmly and by itself.
  5. Attach the box at the concrete reinforcement, t prevent the box from floating (cable ties).

Installation DOT 28

All electrical installations and maintenance work have to be carried out by an authorized electrician of your trust according to local safety standards. Before drilling, check the position of main leads in order not to damage them! Attantion! Before you start working, make sure to disconnect main leads (230V) from power grid! Switch of fuses.

  1. Please read the circuit diagram included in the delivery carefully. For more information and updates on new LED generations, go to www.georgbechterlicht.at. For parallel and radial setup.
  2. Observe the following cable lengths and cable cross sections: Up to max. 25 meter cable length using 1,5mm² cable cross section | Up to max. 40 meter cable length using 2,5mm² cable cross section.
  3. Use the circuit board included in the delivery with the connecting terminals.
  4. Use two crewdrivers or apair of cir clip pliers to insert the LED into the bayonet suspension. Turn the LED to the right by 90° and pull it back down again until it sits flush with the ceiling.
Sorry, currently this content is only available in German.
Sorry, currently this content is only available in German.

Installation DOT 28 Suspending

Attention! Handle Cable of Pendant Luminaire with care!

  1. Set the desired suspension height and catuiously fix it with the two screws. Connect the luminaire using the circuit board according to the installation plan enclosed. Fix the luminaire on the ceiling using the bayonet.
  2. After fixing the desired suspension height, take the blade included in your delivery and cut the protecitve hose lenthwise. 3.Cautiously cut the protective hose at the bayonet.
  3. Remove the protective hose carefully from the cable.

Verve Installation

Make sure the recess of the luminaire remains clean and undamaged during the whole process. Screw the luminaire module onto the same substructure as the plasterboard (12.5 mm). If there is double plating, make sure there is an adequate recess in the first plasterboard plating. Put some fabric tape into the spatula border intended therefor. Finish the joints cleanly and neatly and use a filler which is elastic enough. Ground and apply the paint on the luminaire. (Best use a small structured roll.) The luminaire is not suitable for outside. Don’t use the luminaire on coarse-grained plaster!

Vlobe installation

Electrical installation
All electrical installations have to be made by an authorized electrician you trust. - Connect the device to the mains. - Lead the illuminant with the provided pens. - The installation guidelines of the illuminant manufacturer should always be observed during installation the illuminant.

Installation VOLEM

Volem: With a hole cutter (diameter: 120mm), drill a hole into the plasterboard at the intended location. Screw the luminaire module onto the same substructure as the plasterboard. Finish the joints cleanly and neatly and use a filler which is elastic enough. Ground and apply the paint on the luminaire. The illuminant is not suitable for outside – IP 20!

Volem extro: Screw the construction board on the substructure of the plasterboard ceiling. Mount the plasterboard firmly on the substructure. Fix the plaster module on the construction board. Fill joints cleanly and neatly by using a fabric tape. Ground and apply the paint on the plaster module.

Electrical Installation All electrical installations have to be made by an authorized electrician. Lead the wires through the opening in the luminaire module and connect them to the base supplied. Bend the tension flaps back so you can insert the light fixture into the module. Push the base into the module until the tension flaps lock into place.